top of page

FIBER OPTIC CABLE LAYING WORK

TPAO TDLYPM-219 ŞEHİT ESMA ÇEVİK CRUDE OIL PIPELINE PHASE-1

Our company has completed the engineering, project design and procurement processes related to the installation of SCADA, RTU, FOAS and LDS systems, instrumentation and fiber optic cable supply and assembly work within the scope of the TPAO TDLYPM-219 Şehit Esma Çevik Crude Oil Pipeline Phase-1 construction project, and field work has begun.

Our first field work started with the laying of 48 core fiber optic cable.

The project continues with the addition of 48 core fiber optic cables with a length of 36 km.

image.png
image.png

Address

GAP NEIGHBORHOOD. 2507 STREET ELITE BUSINESS CENTER FLOOR: 2 NO: 2 CENTER / BATMAN

Telephone

0488 221 26 47

E-mail

Connect

  • Youtube
  • Twitter
  • LinkedIn
  • Instagram
bottom of page